Newly constructed farm dam with machinery on a rural property in Queensland

Water where you need it

Dam Construction in Queensland

New dams built and old dams cleaned out and rebuilt — keyed in, compacted and given a proper spillway, so they hold water and hold together.

Trusted by real property owners

Land Handed Back Clean and Usable

Joel Murray

★★★★★

Mitch from Full Force Contracting cleared 5 acres of our property quickly and professionally, leaving everything neat and tidy. Highly recommend!

Hayley Smith

★★★★★

The team at Full Force Contracting were very pleasant and easy to deal with and did amazing, neat work across my property. I would highly recommend their services.

Jack Willson

★★★★★

Great at what they do, made a massive difference clearing our property

Mitch, owner of Full Force Contracting, on site with forestry mulching and excavation equipment in Queensland

Read our reviews on Google

Why this matters

A Dam That Leaks Is Just a Hole

A dam either holds water or it does not, and the difference comes down to things you cannot see once it is finished: whether the wall was keyed into suitable material, whether it was built up and compacted in layers, and whether the spillway was ever sized properly.

Older dams have their own problem. Decades of silt reduce capacity year after year until the dam runs dry months earlier than it used to, and undersized or eroded spillways put the whole wall at risk in a big event.

What we do

Built to Hold Through a Dry Summer

We build new farm dams and rework existing ones. That means assessing the site and the material, keying the wall into suitable ground rather than sitting it on topsoil, and building it up in compacted layers so it does not leak or slump.

Spillways get sized and shaped so the dam can safely pass a big event without cutting into the wall. On existing dams we desilt to restore the capacity you have lost, rebuild eroded walls and batters, and reshape the catchment and inflow so the dam actually fills the way it should.

Farm dam with machinery on the bank after earthworks in QueenslandCompleted farm dam filled with water on a rural property in Queensland

How the job runs

Water That Is Still There in March

Most of what makes a dam work is decided before the first bucket comes out.

  1. We assess site and soil

    Location, catchment and — most importantly — the material we are building in. Some ground holds water and some does not, and you want to know that before the dig, not after.

  2. We key in and compact

    The wall is keyed into suitable material and built up in compacted layers, which is what stops seepage and slumping down the track.

  3. We shape the spillway

    Spillway and batters are shaped so a big event passes safely instead of cutting into the wall, and the catchment is set up to feed the dam properly.

Call 0480 180 502 now

Serving Queensland

Areas We Cover Around Dayboro and Beyond

Based in Dayboro and working across Queensland, from Brisbane through to Townsville. Regular work throughout the Moreton Bay, Somerset and Sunshine Coast hinterland regions.

View our Google Business Profile

View All Service Areas

The cost of waiting

Silt and Seepage Cost You Water

Leaving a dam alone, or having one built cheaply, usually leads to:

  • Capacity quietly lost to silt until the dam runs dry months earlier each year
  • Seepage through a wall that was never keyed into suitable material
  • Spillway erosion cutting back toward the wall and threatening the whole structure
  • Stock water running out in exactly the season you most needed it

Get a trusted solution

Muddy farm dam site with machinery tracks showing seepage and silt issues in Queensland

Related services

Other Work That Often Goes With This

Plenty of blocks need more than one approach. Not sure which service fits your situation? Get a free on-site quote and we will walk the property with you and recommend the right method.

Straight answers

Good Questions — Here's What to Know

Do I need approval to build a dam in Queensland?

It depends on size, location and whether it takes or interferes with overland flow or a watercourse. Small stock and domestic dams outside a watercourse are often straightforward, larger referable dams are not. Check with your council and the state before you commit — we will flag anything that looks like it needs approval.

How do you know whether the ground will hold water?

We assess the material on site, and on anything substantial we will recommend test holes so you are not guessing. Clay content is what makes or breaks a dam. If the ground is not suitable, it is far better to know before the dig than after the first wet.

Can you clean out an existing dam?

Yes, desilting is a big part of what we do. It restores capacity that has been quietly lost over decades, and while the machine is there we can rebuild eroded walls and batters and reshape the spillway.

When is the best time of year to build?

The dry, without question. You need workable, compactable material and the ability to get machinery in and out. Trying to build a dam in the middle of a wet summer makes a difficult job much harder and more expensive.

Get a Straight Price for Your Property

Tell us what you are dealing with and we will come out, walk the property and give you a fixed quote for dam construction. No obligation.

Call 0480 180 502Free Quote